

🐕🦺 Train like a pro, leash like a legend!
The Lynxking Check Cord Dog Leash features a 3/8” thick durable polypropylene rope with a 360° rotating clasp to prevent tangles. Lightweight and water-resistant, it floats on water and stays easy to handle. Its double-layer woven handle ensures comfort and strength, available in multiple lengths (10ft to 50ft) to suit small to large dogs for training, hiking, and outdoor activities.











| ASIN | B07WPPG9JL |
| ASIN | B07WPPG9JL |
| Best Sellers Rank | #7,564 in Pet Supplies ( See Top 100 in Pet Supplies ) #18 in Dog Training Leashes |
| Brand Name | Lynxking |
| Breed Recommendation | Small Breeds |
| Care Instructions | Hand Washable |
| Color | Orange |
| Date First Available | July 20, 2019 |
| Date First Available | July 20, 2019 |
| Directions | DOG |
| Included Components | leash |
| Item Dimensions LxWxH | 180 x 0.37 x 0.38 inches |
| Item Package Dimensions L x W x H | 11.14 x 6.02 x 2.36 inches |
| Item Weight | 8.4 ounces |
| Item model number | LL-1 |
| Item model number | LL-1 |
| Manufacturer | Keenleader.,ltd. |
| Manufacturer | Keenleader.,ltd. |
| Material | Metal, Polypropylene |
| Model Name | check cord |
| Product Dimensions | 180 x 0.37 x 0.38 inches; 8.47 ounces |
| Size | rope3/8"x15' |
| Specific Uses for Product | dog |
| Style | round rope lead |
| Target Audience Keyword | dogs |
| Warranty Description | 2 years |
ترست بايلوت
منذ 3 أسابيع
منذ أسبوع