

⭐ Track, Celebrate, Transform – One Pound at a Time! 🦋
This A4 weight loss progress chart from Gifts and Temptations is a stylish and practical tool designed to help women track up to 6 stone (38.1 kg) of weight loss. Featuring a 13-column grid for weekly tracking, an inspiring butterfly design, and a sheet of gold star stickers to mark milestones, it serves as a motivational visual aid to maintain focus and celebrate success throughout the fitness journey.
| Manufacturer | Gifts and Temptations |
| Brand | Gifts and Temptations |
| Product Dimensions | 29.7 x 21 x 0.2 cm; 30 g |
| Colour | Brown and Gold |
| Cover Material | Cardstock |
| Material Type | Cardstock |
| Ruling | Grid |
| Sheet Size | 21 x 29.7 Centimetres |
| Manufacturer Part Number | weight-loss-6-stone |
| Item Weight | 30 g |
K**N
Simple but effective
Nice simple chart and helps stay on track of my weight loss
M**S
Brilliant for the fridge
I have just completed my first 6st! Shared the link to my tiktok and its getting loads of love, really helped me to get to my first target. Thank you!
C**N
Easy to use to chart your weight losd
A lovely chart to show your weight loss and putting the stars on the chart makes me feel like a kid again lol
C**Y
What it says
I recently purchased a weight loss chart to help track my progress, and it's been a mixed experience. On the positive side, having a visual representation of my weight loss journey has been motivating. Seeing the line trend downwards each week provides a sense of accomplishment and encourages me to stay on track. However, the chart itself is fairly basic. It's just a simple grid with spaces to record my weight, and there's not much room for additional notes or details. I also found the paper quality to be a bit thin, so I had to be careful not to tear it when writing. Overall, this weight loss chart is a functional tool for tracking progress, but it lacks some of the features and durability I was hoping for. It's a decent option if you're looking for a simple and affordable way to monitor your weight loss, but you may want to consider a more comprehensive chart or app if you need more detailed tracking and analysis.
R**N
Gives me motivation
Really good idea. I keep mine on my fridge I’m nearly two stone down now.
C**Y
Great for tracking my weight loss
Plain and simple to see my progress
M**A
Item as described
Quite happy with the product. Exactly as advertised with no issues or complaints. Provided a large sheet of star stickers. There is enough area in the boxes to place the stickers but also see the number. I do wish the paper was of higher quality or made of a stronger material.
A**R
Motivational
Great item,keeps me motivated,good price and fast delivery.
ترست بايلوت
منذ أسبوعين
منذ يوم واحد